Projects
Engineering Projects for 2012
- 2012-07 Eastside 150,000 Gallon Water Tower Rehab — 11/1/2012
- In general, the Work consists of repainting an existing 150,000 gallon sphe… (continued)
- 2012-08 Division Street Bridge Replacement — 11/1/2012
- The project includes the replacement of the bridge with three lines of prec… (continued)